Snack factory owners and Meiteng engineers standing together after a project meeting

Our Clients

3D Food Machine Results from 500+ Global Clients

Jinan MT Machinery, maker of Meiteng twin-screw extruders in Shandong, China, has delivered 1,000+ production lines to 60+ countries. Snack plants and pellet producers explain what changed on their floors.

Global clients
500+
Production lines
1,000+
Export countries
60+
OEM partners
30+

Market Coverage

Meiteng Lines Serve Snack Producers Across Five Regions

Meiteng 3D food and frying lines ship from Shandong, China, to main markets in South Asia, Southeast Asia, the Middle East, Africa and Latin America. Each project is planned around local voltage, heat source and raw material.

Shandong factory 123455
  1. 1

    South Asia

    India, Bangladesh, Pakistan

  2. 2

    Southeast Asia

    Indonesia, Vietnam, Thailand

  3. 3

    Middle East

    United Arab Emirates, Saudi Arabia

  4. 4

    Africa

    Nigeria

  5. 5

    Latin America

    Brazil, Mexico

Client Answers

Four Production Problems Our Clients Solved

Meiteng clients fixed pellet cracking, high oil content, slow shape changes and raw material mismatch by matching each line section to the product. Plant managers report the results below.

How do you stop pellets cracking in storage?

Dry in stages, so the pellet loses moisture evenly before it goes to the warehouse.

“Drying was our biggest loss - pellets cracked after two weeks in the warehouse. With the multi-stage dryer, breakage dropped to almost none.”

Shahidul AlamProduction Manager, Dhaka Snack Foods, Bangladesh

How do you lower oil content in fried chips?

Add a de-oiling section directly after the fryer and before seasoning.

“Potato and cassava based chips at six points lower oil content than our old fryer line, thanks to the de-oiling section.”

Mostafa HassanTechnical Director, Cairo Snack Co., Egypt

Can one line make many shapes without slow changeovers?

Yes. Change the die set instead of building a separate mould for every shape.

“Papad and 3D pellets in different shapes without a mould per shape. Dies swap in 20 minutes and the shape stays crisp after frying.”

Vijay KumarPlant Owner, Kumar Papad Industries, India

“Over 200 shapes from the die set, and the 3D pellet keeps its shape through frying without curling.”

Imran SheikhFactory Manager, Lahore Snack Mills, Pakistan

Will the line work with our local flour?

Yes. Lines run on potato, cassava or wheat, and you can test your own raw material at our factory.

“They configured the line around our local cassava flour, not a generic recipe, and expansion is even across the whole belt.”

Rizky HidayatOperations Manager, Hidayat Snacks, Indonesia

Complete Line Stories

Build One Line, Section by Section, from One Factory

Buying every section from one manufacturer keeps mixing, extrusion, drying, frying, de-oiling, seasoning and packaging aligned. Two owners show how that protected their investment as output and product range grew.

Twin-screw extruder and stainless steel conveyors assembled on a snack production floor

Single machine first, full line later

Start with one machine. Add sections when sales justify it.

“We bought a single machine first and later added the fryer and seasoning from the same factory, so every section lines up.”

Chinedu ObiChinedu ObiManaging Director, Obi Snack Foods, Nigeria

A free process plan with CAD and 3D workshop layout shows how later sections will connect before you buy the first one.

Workers checking a stainless steel dryer and fryer section in a food machinery workshop

2D pellets plus fried chips

Add fried chips without funding a second plant.

“Starch-based 2D pellets were our only product; now we also run fried chips on the same line. One investment instead of two.”

Nguyen Van DucNguyen Van DucOwner, Duc Snack, Vietnam

Output, dies, screw combination, heating method and recipe are configured to the product mix you plan to sell.

View 3D Food and Frying Chips Machines

At the Factory

Clients See and Test the Line Before It Ships

Clients can visit our 20,000 m² Shandong plant, run trials with their own raw material and arrange third-party inspection. Every line completes a full trial run before leaving the factory.

Client inspecting a stainless steel extruder with a Meiteng engineer
Customer factory visit — Jinan MT MachineryCustomer factory visit — Jinan MT MachineryCustomer factory visit — Jinan MT MachineryCustomer factory visit — Jinan MT Machinery
Buyers checking dryer belts and welded joints in the test workshop Inspection team examining a finished fryer section before crating
Wooden export crates holding food machinery being loaded onto a truck at the factory

On-Site Commissioning

Our Engineers Install the Line and Train Your Operators

Meiteng engineers travel to your plant to install and commission the line, then train the people who will run it. Your team takes over a working line.

“Their engineer came for commissioning, trained our staff and left only after the line hit the agreed output.”

Saleh Al-GhamdiSaleh Al-GhamdiPlant Manager, Jeddah Food Industries, Saudi Arabia
Plan Your Line Installation
  1. Full-line trial run

    The complete line runs in our test workshop before shipment. Third-party inspection can be arranged.

  2. Protected export packing

    Export wooden cases with rust and moisture protection, shipped with full customs documents.

  3. Installation and commissioning

    Engineers install each section at your plant and commission the line from mixing to packaging.

  4. Operator training

    Your operators learn to run the PLC/MCC controls and the line on your own floor.

Long-Term Use

Support Continues Long After Commissioning Ends

Every Meiteng line carries a 12-month warranty, spare parts at cost price with priority shipping, parts supply for 10+ years and lifetime remote support. One chief engineer reports on year two.

  1. 12months

    Warranty

    Coverage starts with a line already proven in a full factory trial.

  2. Year 2

    “Two years later the die and screw are still in tolerance, and spare dies arrive at cost within a week.”

    Prasert ChaiyapornPrasert ChaiyapornChief Engineer, Chaiyaporn Foods, Thailand
  3. 10+years

    Spare parts supply

    Parts ship at cost price with priority, so a worn component does not stop production for long.

  4. Lifetime

    Remote support

    Reach engineers by video, WhatsApp or email. Preventive maintenance, emergency repair and staff training are available.

Customs Feedback

Complete CE Paperwork Speeds Customs Clearance

Meiteng lines ship with CE documents and food-grade stainless steel on material-contact parts, so importers can present a complete file at customs.

  • CE, Machinery Directive 2006/42/EC
  • ISO 9001:2015 quality management system
  • CE certificate, packing list, invoice and customs documents

“Food-grade stainless and CE paperwork were in order, so customs clearance took days, not weeks.”

Felipe BarbosaImport Manager, Barbosa Alimentos, Brazil

Framed machinery safety certificate on a white background Framed quality management certificate on a white background

Ways to Work Together

OEM/ODM Lines for Distributors and Snack Brands

Jinan MT Machinery works with 30+ OEM partners and builds Meiteng extruders and complete lines in its own factory. Equipment distributors and snack brand owners get direct manufacturing support.

Meiteng team presenting food machinery to visitors at a trade show booth

For Food Equipment Distributors

  • Factory-direct source for extruders and complete lines
  • Common standard models in stock, delivered within 10 days
  • Spare parts supply for 10+ years to protect your customers
Discuss a Distribution Partnership
Snack brand owners discussing a production line with engineers at an exhibition stand

For Snack Brand Owners

  • Output, dies, screw combination and heating customized
  • Recipe tests and machine trials with your own raw material
  • Custom solutions delivered in 30–50 working days
Plan an OEM Snack Line

Your Project

Join 500+ Clients Running Meiteng Lines

Tell us your product, output, raw material, local voltage and heat source. You receive a free process plan, CAD and 3D workshop layout, and an itemized technical quotation, with a reply within 24 hours.